File:Spacelaunchsystem-enginesection-jan2020.jpg

页面内容不支持其他语言。
這個文件來自維基共享資源
维基百科,自由的百科全书

原始文件(1,014 × 792像素,文件大小:115 KB,MIME类型:image/jpeg


摘要

描述
English: Teams at NASA’s Michoud Assembly Facility in New Orleans moved the core stage, complete with all four RS-25 engines, for NASA’s Space Launch System (SLS) rocket to Building 110 for final shipping preparations on Jan. 1. The SLS core stage includes state-of-the-art avionics, propulsion systems and two colossal propellant tanks that collectively hold 733,000 gallons of liquid oxygen and liquid hydrogen to power its four RS-25 engines. The completed stage, which will provide more than 2 million pounds of thrust to help power the first Artemis mission to the Moon, will be shipped via the agency’s Pegasus barge from Michoud to NASA’s Stennis Space Center near Bay St. Louis, Mississippi, later this month. Once at Stennis, the Artemis rocket stage will be loaded into the B-2 Test Stand for the core stage Green Run test series. The comprehensive test campaign will progressively bring the entire core stage, including its avionics and engines, to life for the first time to verify the stage is fit for flight ahead of the launch of Artemis I.
日期
来源 https://www.instagram.com/p/B63Zo2XHsXr/
作者 NASA

许可协议

Public domain 本文件完全由NASA创作,在美国属于公有领域。根据NASA的版权方针,NASA的材料除非另有声明否则不受版权保护。(参见Template:PD-USGov/zhNASA版权方针页面JPL图片使用方针。)
警告:

说明

添加一行文字以描述该文件所表现的内容
The Space Launch System Core Stage rolling out of the Michoud Facillity for shipping to Stennis

此文件中描述的项目

描繪內容

image/jpeg

文件历史

点击某个日期/时间查看对应时刻的文件。

日期/时间缩⁠略⁠图大小用户备注
当前2020年1月24日 (五) 03:562020年1月24日 (五) 03:56版本的缩略图1,014 × 792(115 KB)Ras67higher resolution
2020年1月4日 (六) 09:472020年1月4日 (六) 09:47版本的缩略图844 × 652(207 KB)Woog24User created page with UploadWizard

以下页面使用本文件:

全域文件用途

元数据